This drop scaffold access (for caisson installation) is suspended from the caisson porch steelwork at deck level, the lower access platform being in excess of 17m below the suspension level. Some of the design problems encountered related to the capacity of the porch steelwork, the lack of tying points, the support of the outer edge of the steelwork with guys and the maintenance of clearance for caisson stabbing.

Port side of Bonga FPSO vessel.

Alwyn Richards - Temporary Works Design - Scaffolding Design - BONGA FPSO (Floating production, storage & offloading vessel) Niger Delta BONGA FPSO (Floating production, storage & offloading vessel) Niger Delta

Project name:

BONGA FPSO (Floating production, storage & offloading vessel) Niger Delta


Location:

Bonga FPSO, Niger Delta, Nigeria


Type of Scaffold:

Multi-level drop scaffold access


Scaffolding Contractor:

Sterling Scaffolding Ltd


Client:

Shell International


Our Client:

Sterling Scaffolding Ltd


Date of Works:

October 2004